Facility Operations

Equipment

GENERAL PROVISIONS

  • Locate both movable and fixed equipment on plans and specify all utility fittings for equipment shown.
  • Locate all blocking, support, and services required for installation of all items in this Division.
  • Clearly define contractor responsibilities relative to receiving, storage and installation of equipment.

 

112123 – VENDING MACHINES

  • Each vending machine requires one (1) 20 A breaker and one (1) data drop (network connection)
  • Water and drain as required by machine type.

 

115213 – PROJECTION SCREENS

  • Coordinate with WSU CaTS