|
|
 |
The Master Plan
Phase 6 - Loop Road
- Redesign Lots #11, 12 and 13 and the entrance to the Creative Arts Center.
- Redevelop the area between the Creative Arts Center and the Library, creating a large forecourt plaza.
- Construct a bike path on the east side of Loop Road from Center Road to University Boulevard.
|