Wright State University CalendarsSearchDirectories
Online Drawings
Facilities & Planning
Engineering & Construction
Current Projects
Forms & Resources
Campus Master Plan
Art On Campus
Contact Us
Facilities/Engineering Home
WSU Home
Campus Master Plan 


Introduction | Assessment | The Master Plan | Development Standards
Campus Master Plan

The Master Plan

Phase 3 - East Core Campus

Phase 2
  • Phase out parking in Lots #13, 14 and 15, redeveloping the area as campus open space.
  • Draw the Student Union into the core campus by removing Lot #5 and constructing more direct pedestrian paths.
  • Remodel the connector between Hamilton Hall and the Student Union to allow the pedestrian corridor between the parking areas in front of the Student Union and the core of the campus to pass through. Create a new wheelchair entrance to Hamilton Hall.
  • Redevelop the small plaza at the north entrance to the Student Union.
3640 Colonel Glenn Highway - Dayton, Ohio - 45435
Copyright Information © 2006 | Accessibility Information
Last updated: Mon. Apr-16-07, 14:12
Please send comments to: construction@wright.edu
Wright State University logo